Visualize how export headroom H is allocated fairly across EVs using weighted max–min (“water-filling”). Capacity part uses kW at the coincident peak; Network tariff part uses kWh and an injection pool.
| # | pᵢ (kW) | wᵢ | bᵢ = pᵢ/wᵢ | aᵢ (kW) | cᵢ (kW) | € share |
|---|
Allocate an injection pool (kWh) to EVs and bill remaining net import energy at a tariff (€/kWh). Choose allocation rule.
| # | eᵢ (kWh) | wᵢ (used) | aᵢ (kWh from injection) | cᵢ (kWh net import) | Import € (cᵢ×r) | Credit € (aᵢ×r_in) | Net € |
|---|
24 hourly prices (bars). Drag the window edges on the chart to set EV A’s start & stop; cost uses hourly prices.
| # | Energy over day (kWh) | Energy cost (€) |
|---|
Peak € (kW) + Network tariff € (kWh) + TOU energy € (€/kWh over the day).
| # | Peak € | Network tariff € | Energy (TOU) € | Total € |
|---|